4. "Z' Base Trim (Optional)

'Z' Base trim is installed along bottom edges of Modular Building that
are flush with concrete pad. 'Z' Base trim is outlined and installed on
concrete pad before the placement of vertical panels. 'Z' Base trim
should be secured to concrete pad by installer. Vertical panels will be

secured with wall anchors after Modular Building erection. Apply
caulk along exterior and interior seam along vertical panels and 'Z'
base trim. See Figure 4.







5. Installation of Less-Floor Walk-Ins

A. After you have checked that the building floor is level, use a transient

or builders level to find the highest point on the perimeter. Position
the first 12 x 12 corner to be level with the high point. Begin at
corner and align panels at the top. See Figure 5.

B. Position a vertical panel to the right and left of the corner panel (as

per Plan View) and flush with the perimeter line. See Figure 7. Once
these panels have been aligned properly, fully engage all vertical-to-
vertical locks.

C. Level these panels to the perimeter high point and check for plumb

with a 48” spirit level. (Panels over 10’ in height should be checked
for plumb with a plumb bob.)

D. As each panel is installed, check to make sure it’s plumb and level. If

the panel is not plumb, shim to adjust for plumb. Making the same
check down the panel’s leading edge shows whether it’s level along
the top or not. If not adjust accordingly.

E. Continue installing vertical panels in the same manner, periodically

checking to make sure that panels remain plumb and level. See
Figure 6.
(staggered locking sequence).

F. When enough vertical panels are set to accept the installation of the

first ceiling and end panel, begin assembly of the ceiling panels. See

Section 7 for method of installing remaining vertical and ceiling
panels.

G. With installation complete, caulk the bases of the vertical panels

where they meet the concrete floor.