Installation of the controller – Bally Refrigerated Boxes 1000 Northwind Blast Chiller User Manual

Page 9

Advertising
background image

9

5. Secure all Panel Sections

5.1 After all Speed-Loks are secured, install access hole

plug buttons to all Speed-Lok locations.

5.2 Anchor both sides of the doorframe inside the box to

the floor with “L” braces with 5/16” expansion bolts
and 5/16”hex head self-tapping screws with
shoulders to the door panel.

5.3 Using the silicone supplied, caulk both interior and

exterior of box at floor joints.

5.4 Install SS continuous angle floor anchor (Bally PN

019045) around inside periphery of the box.

6.

Installation of the Controller

6.1 Have a partner hold the controller up and feed

the connectors through the controller slot in
the front of the box. Then push the
rectangular collar of the control assembly into
the slot until the base of the controller is
against the face of the blast chiller. Back out
the three screws that hold the front cover onto
the controller base. Remove the controller
cover, and screw the controller base to the wall
panel.

6.2 Two interlocking stainless steel harness covers

lock around the incoming cables of the control
panel. Secure the cover plates to the box front
panels by preparing a pilot home with 1/8” drill
and finishing with ½” stainless steel, self-
tapping, Phillips head sheet metal screws. Fill
the volume with canned foam. Fill any gaps
between the wall panels and the plastic
wrapped chute with canned foam.

6.3

Install the two top ceiling deflectors in the
upper top corners of the sides of the box