Bard STAGED CAPACITY PACKAGED HEAT PUMP QW5S1 User Manual

Page 12

Advertising
background image

Manual 2100-532B
Page

12 of 46

FIGURE 8A

CONDENSATE DRAIN

FIGURE 8B

OPTIONAL REAR DRAIN

The drain can be routed through the floor or through the wall. If the drain is to be routed through an unconditioned
space, it must be protected from freezing. The drain line must be able to be removed from the unit if it is necessary
to remove the unit from the wall.

MIS-2743

FLOOR

OPTION

DRAINING

EXTERNAL
DRAIN TUBE

DRAIN HOSE

FRONT VIEW WITH CONDENSER DOOR REMOVED

ALTERNATE

LOOP TO FORM
A "P" TRAP

Advertising