LOW VOLTAGE CONNECTIONS

The “R” terminal is the 24 VAC hot terminal and is
supplied through Pin #10 of Plug P2.

The “C” terminal is the 24 VAC common/grounded
terminal and feeds through Pin #11 of Plug P2.

The “G” terminal is the indoor blower input signal and
feeds through Pin #6 of Plug P2.

The “Y1” terminal is the compressor starting signal and
feeds through Pin #7 of Plug P2.

The “Y2” terminal is the compressor staging solenoid
signal and feeds through Pin #4 of Plug P2.

The “O” terminal is the reversing valve signal and
feeds through Pin #8 of Plug P2.

The “A” terminal is the ventilation demand signal and
outputs a signal for ventilation during occupied
programming conditions, and feeds through Pin #5 of
Plug P2.

The “W2” terminal is the electric heat signal and feeds
through Pin #9 of Plug P2.

The “W1/E” terminal is the emergency heat signal and
feeds through Pin #3 of Plug P2.

The “L” terminal is used as an input terminal when a
CS2000 infrared occupancy device is used. It feeds
through Pin #12 of Plug P2.

The “D” terminal is used only of dehumidification
models and feeds through Pin #1 of Plug P2.

LOW VOLTAGE CONNECTIONS FOR

DDC CONTROL

Fan Only

Energize G

Ventilation

Energize G, A (any mode of operation)

Part Load Cooling

Energize G, Y1, O

Full Load Cooling

Energize G, Y1, Y2, O

Part Load HP Heating

Energize G, Y1

Full Load HP Heating

Energize G, Y1, Y2

Electric Heat

Energize G, W2

Dehumidification

Energize G, D, O

FIGURE 13

BLOWER MOTOR LOW VOLTAGE

WIRE HARNESS PLUG

MIS-1285