Bunn T6A User Manual

Page 5

Advertising
background image

Page 5

INITIAL SET-UP (FILL & HEAT)

CAUTION - The brewer must be disconnected from the power source throughout the

Initial Set-Up

, except

when specified in the instructions.

1. Complete the electrical and plumbing instructions prior to starting this procedure.
2. Remove the top panel and check that the thermostat dial is rotated fully counterclockwise to the “OFF”

position.

3. Set the delay dial at eight minutes. Replace top panel. Plug in brewer.
4. Remove the filter screen and metal ferrule from the funnel to speed this procedure. Insert the funnel into the

funnel rail and push it until it stops. Rotate the funnel handle to the left or right (T6) to align the funnel
discharge over the hole in the reservoir cover. (Model T3 funnel does not rotate.)

5. Turn the ON/OFF switch (T3) to “ON” or SELECTOR switch (T6) to the “LEFT” or “RIGHT” and momentarily

depress the start switch. Water will immediately start flowing into the water tank and will automatically shut
off at the end of three minutes. Depress the start switch again. During the second period the tank will fill to
its capacity and the excess will flow from the sprayhead and out of the funnel.

6. Wait until the flow stops then turn the ON/OFF or SELECTOR switch to the “OFF” position.
7. Rotate the thermostat fully clockwise, (“ON”) and wait for the water tank to stabilize at its proper tempera-

ture. During this period some water will come out of the funnel due to expansion, this will not occur thereaf-
ter.

8. Turn the ON/OFF switch (T3) to “ON” or SELECTOR switch (T6) to the “LEFT” or “RIGHT” and depress the

start switch to cycle the control thermostat.

9. Wait until the flow stops then turn the ON/OFF or SELECTOR switch to the “OFF” position.
10. The brewer is now ready for initial timer adjustment.

INITIAL TIMER ADJUSTMENT

1. Complete the initial fill and heat instructions prior to starting this procedure.
2. With the filter screen and metal ferrule removed from the funnel, water will flow quickly from the funnel and

speed this procedure. Insert the funnel into the funnel rails and push it until it stops. Rotate the funnel handle
to the left or right (T6) to align the funnel discharge over the hole in the reservoir cover. (Model T3 funnel
does not rotate.)

3. Check the delay dial is at eight minutes and the dilution dial is at three minutes and forty-five seconds.
4. Empty the tea reservoir of any water that may have accumulated.
5. Turn the ON/OFF switch to “ON” (T3), or the SELECTOR switch to “LEFT” or “RIGHT”, (T6), and momentarily

depress the start switch. After a few seconds water should flow from the funnel into the reservoir. Allow this
to continue until it stops and immediately turn the ON/OFF or SELECTOR switch to “OFF”.

6. Measure the water collected in the reservoir. It should equal seventy-six ounces. If it is less or more than this

amount, adjust the brew timer accordingly (See

Adjusting Brew Volumes

) and repeat Steps 5 and 6 until you

get the proper amount.

7. Rotate the delay dial fully counterclockwise to speed this next procedure. Drain the reservoir.
8. Momentarily depress the start switch and allow both the concentrate and dilution cycles to occur. When all

water stops flowing, the level in the reservoir should be in the middle of the two lower stud heads that hold
the dilution water nozzle in place. If it is not correct, rotate the dilution dial up or down accordingly and repeat
this step until the proper level is achieved.

9. Return the delay dial to eight minutes.

10145 072600

Advertising
This manual is related to the following products:

T3A, T6, T3