Step 9 install ab cable – BodyCraft BCG 446 User Manual

Page 15

Advertising
background image

14

STEP 9 INSTALL AB CABLE

A4

T8

29

87

82

49

A6

C2

29

82

49

87

A5

1

82

87

49

(94a)

A1

A1, A2

3, 11a

2

A2

A3

A3

A7

A5

A6

A7

C2

A4

T8

79

80

80

68

68

49

49

90

90

90

90

90

90

87

87

87

82

27a

Insert eyelet end of AB CABLE(94a) into slot in front of PRESS UPRIGHT(3), over
pulley A1, A2 down and around pulley A3 up and around pulley A4 down and around
pulley A5 up and around A6, then insert the eyelet end into the slot of PEC DEC
UPRIGHT(2) and fixed using 3/8" x 2-1/2" HEX HEAD BOLT(80), two 3/8" WASHER(90)
and 3/8" NYLON NUT(87).

Advertising