2.3 Flow diagram

■■■■■■■■■■■■■■■■■■■■■■

10

■■■■■■■■

850 Professional IC –Anion – MCS – Gradient

8 Install sample path connections.

Connect the sample degasser (if required) (see Chapter 2.13,
page 39)
.

Connect sample path connections to the injection valve (see
Chapter 2.14.2, page 41)
.

9 Installing the MSM (see Chapter 2.16, page 46) – with associated

peristaltic pump (see Chapter 2.17, page 49).

10 Connect the MCS (see Chapter 2.18.2, page 54).

11 Connect detector capillaries (see Chapter 2.19, page 57).

12 Mains connection (see Chapter 2.20, page 60).

13 Connect the instrument to the PC (see Chapter 2.20.1, page 60).

14 Initial start-up (see Chapter 3.1, page 65).

15 Install the guard column (if used) (see Chapter 2.21, page 61).

16 Install the separation column (see Chapter 2.22, page 63).

2.3

Flow diagram

Figure 2 Flow diagram with gradient technology and sequential suppres-
sion
shows flow diagrams of the flow paths with the application of gradi-
ent technology and sequential suppression (MSM (2-17) and MCS (2-18)).
The arrangement of the modules in the diagram corresponds to the front
view of the instrument. Liquid containers (eluent bottle, sample vessel,
waste container, auxiliary solutions container) and guard column (see
Chapter 2.21, page 61)
are not shown in the diagram. Which pressure
screws, connections and couplings are used, is described in the installation