7 capillary and cable feed-throughs, Capillary and cable feed-throughs – Metrohm 850 Professional IC Anion MSM-HC MCS Prep 1 User Manual

Page 44

Advertising
background image

3.7 Capillary and cable feed-throughs

■■■■■■■■■■■■■■■■■■■■■■

34

■■■■■■■■

850 Professional IC – Anion MSM-HC – MCS – Prep 1

7

Drainage tubing
Section of the 6.1816.020 silicon tubing.
Guides escaped fluid into a waste container.

8

Drainage tubing connection
For draining escaped fluid from the base tray
through the connected drainage tubing.

9

Drainage tubing connection
For supplying escaped fluid through the con-
nected drainage tubing to the leak sensor.

Proceed as follows to install the drainage tubing:

Installing drainage tubing

1 Plug drainage tubing (11-2) into the drainage tubing connection

(11-1) of the covering plate and shorten to required length.

2 Plug drainage tubing (11-4) into the drainage tubing connection

(11-3) of the detector chamber and shorten to required length.

3 Connect drainage tubing (11-2) from the covering plate and drain-

age tubing (11-4) from the detector chamber to the Y connector
(11-5).

4 Connect drainage tubing (11-6) to the Y connector (11-5), shorten

to required length and plug the other end of the drainage tubing
into the drainage tubing connection (11-9).

5 Plug drainage tubing (11-7) into the drainage tubing connection

(11-8) of the base tray and guide the other end into a waste con-
tainer.

3.7

Capillary and cable feed-throughs

Several openings have been integrated for feeding through capillaries and
cables. They are located on the doors (see Figure 12, page 35), on the
rear panel (see Figure 9, Page 29) or below the covering plate or above
the base tray (see Figure 13, Page 36).

Advertising