3 flow diagram, Flow diagram – Metrohm 850 Professional IC Cation Manual User Manual

Page 17

Advertising
background image

■■■■■■■■■■■■■■■■■■■■■■

2 Installation

850 Professional IC– Cation

■■■■■■■■

9

8 Install sample path connections.

Connect the sample degasser (if required) (see Chapter 2.13,
page 38)
.

Connect sample path connections to the injection valve (see
Chapter 2.14.2, page 40)
.

9 Connect detector capillaries (see Chapter 2.16, page 45).

10 Mains connection (see Chapter 2.17, page 47).

11 Connect the instrument to the PC (see Chapter 2.17.1, page 47).

12 Initial start-up (see Chapter 3.1, page 52).

13 Install the guard column (if used) (see Chapter 2.18, page 48).

14 Install the separation column (see Chapter 2.19, page 50).

2.3

Flow diagram

Figure 2 Flow diagram for the 2.850.1010 shows the flow paths. The
arrangement of the modules in the diagram corresponds to the front view
of the instrument. Liquid containers (eluent bottle, sample vessel, waste
container) and guard column (see Chapter 2.18, page 48) are not
shown in the diagram. Which pressure screws, connections and couplings
are used, is described in the installation chapters of the individual mod-
ules.