Banner SureCross DX80 Wireless Networks User Manual

Page 4

Advertising
background image

Analog Configuration, Switch 2 OFF

DIP Switches

Descriptions

3

4

5

6

7

8

Sample/Report Rate 64 seconds

ON

OFF

OFF

Sample/Report Rate 5 minutes

ON

OFF

ON

Modbus or UCT configured (overrides DIP switches)

ON

ON

OFF

Sample/Report Rate 15 minutes

ON

ON

ON

Analog IN 2 (not available in integrated battery model), Discrete 1, and Discrete 2 are not powered from switched power terminals. In this
configuration, SP2 is disabled. If you need SP2, contact the factory.
Boost Voltage
The boost voltage is the power supplied to the sensor powered by this FlexPower Node.
Modbus/User Configuration Tool (UCT) or DIP Switch Configured
In Modbus/UCT Configured mode, the device parameters are changed using the User Configuration Tool (UCT) or a Modbus command.
All DIP switch positions are ignored. In DIP Switch Configured mode, use the DIP switches to configure the parameters listed in the table.
Sample and Report Rates
The sample interval, or rate, defines how often the SureCross device samples the input. For battery-powered applications, setting a slow-
er rate extends the battery life.
The report rate defines how often the Node communicates the I/O status to the Gateway. Change of state reporting sets the system to
report only when the value crosses the threshold setting. For FlexPower™ applications, setting the report rate to a slower rate extends
the battery life.
Warm-Up Time
The warm-up time defines how long the device must power up the sensor before a stable sensor reading is taken.

DIP Switch Settings for Discrete Configuration (DIP Switch 2 ON)

The discrete configuration matches the switch power outputs (SP1, SP2) with the discrete inputs. The discrete configuration is selected
when switch 2 is in the ON position. Two sinking discrete outputs are active for this configuration.

Discrete Configuration, Switch 2 ON

DIP Switches

Descriptions

3

4

5

6

7

8

Discrete Sinking (NPN)

OFF*

Discrete Sourcing (PNP)

ON

Boost Voltage: 5V

OFF*

Boost Voltage: 10V

ON

Warm-up Time 4 milliseconds

OFF*

Warm-up Time 10 milliseconds

ON

Sample/Report Rate 62.5 milliseconds

OFF

OFF

OFF

Sample/Report Rate 125 milliseconds

OFF

OFF

ON

Sample/Report Rate 250 milliseconds

OFF

ON

OFF

Sample/Report Rate 500 milliseconds

OFF

ON

ON

Sample/Report Rate 1 second

ON

OFF

OFF

Sample/Report Rate 2 seconds

ON

OFF

ON

Modbus or UCT configured (overrides DIP switches)

ON

ON

OFF

Sample/Report Rate 16 seconds

ON

ON

ON

Discrete IN 1 uses switched power 1 (SP1). Discrete IN 2 uses switched power 2 (SP2).

SureCross DX80 FlexPower Node

4

www.bannerengineering.com - tel: 763-544-3164

P/N 131296 Rev. L

Advertising