After a PRIME the CLX will perform a water calibration (WCAL). It will take
a few minutes to complete this procedure.

3 Month Tubing Replacement
The “B” tubings need replacement more often due to the fact that they are subject to wear
from the reagent “Pump”. The check valves should not need to be replaced and should be
saved. Please note that the check valves are directional and that the “IN” side is smaller in
diameter (see drawing).
Steps:
1

Flush the system as described above to reduce personal contact with the reagents.

2

Press SERVICE to stop the flow of sample water and drain the cuvette.

3

Remove and retain the thumb screw on top of the pump; pull the pump hammer and
spring up and out of the way. There is no need to completely remove the hammer and
spring.

4

Working on one reagent side at a time. Replace the “B” (black) tubing between optics
inlet and the check valve OUTLET. Discard the old “B” tubing.

5

Ensure the check valve is placed into its seat.

6

Repeat steps 4 & 5 for the other reagent.

7

Replace the hammer and spring back into place and secure with the thumb screw.

8

Check the drawing on the following page to ensure correct installation.

9

Return to operation as described.

Annual Tubing Replacement

The "A" Cap Assembly needs to be changed on an annual schedule. Check the condition
of cuvette and change if it appears badly soiled or discolored. Follow the steps below:

1. Replace the two “A” Cap Assemblies.
2. Turn the knurled top on the optics system counterclockwise (as viewed for the top)

until the cuvette just “pops” out, but do not remove the top.

3. When the cuvette “pops” out, move the retaining o-ring & remove the cuvette. You

may need a stiff wire such as a bent paper clip to grasp the cuvette. Retain this cuvette
for future use if it can be cleaned.

4. Install the new cuvette by pushing it firmly in place and turning the knurled top

clockwise until the cuvette is held securely.

5. Check the drawing on the following page to ensure correct installation.
6. Return to operation as described.

Return to Normal Operation
Press the SERVICE button to return sample flow to the system. Check for leaks. If a leak
occurs press SERVICE again, repair leak and try again. Once the system is operating
correctly, return or replace reagents and press PRIME and then  one time to restart
reagent flow. The system will automatically return to normal operation.

Tubes may darken due to contact with the reagent. This condition does not
affect the performance of these parts.