Support – Rite-Ride 4190 User Manual

Page 2

Advertising
background image

SUPPORT

Figure “B”

STEP 1— AIR SPRING PREPARATION

(Part # 6130)

Remove the inflation valve cap from the inflation valve on

the air spring. Using the valve cap as a core tool from the

inflation valve, remove the inflation valve core from the air

spring. Exhaust the air spring by pushing it flat then re-insert

the valve core back into the air spring to keep it collapsed.

STEP 2—INSTALLING THE AIR SPRING

Insert the top of the flattened air spring into the coil spring

through the lowest opening with the inflation valve inlet at

the top as shown in Figure “A”.

STEP 3—ADJUSTING THE AIR SPRING

Push the air spring up into the coil spring by hand or with

a blunt tool. DO NOT use anything with sharp edges or

corners as this may damage the air spring.

When the air spring is completely within the coil spring,

remove the valve core to let the air back into the air spring.

Allow the air spring to return to its normal shape.

Install the spacer on top of the air spring. See Figure

“B”. Once the weight of the vehicle is applied to the sus-

pension aid the air springs are pressurized, the spacer will

stay in place.

STEP 4 — PREASSEMBLY OF THE WORK-RITE

(Part # 1258)

Select one Work-Rite load assist and one face plate (Part

# 5641) for the kit. Attach the Work-Rite to the face plate

using the 3/8"-16 x 1" hex bolt, flat washer, and lock nut.

See Figure “C”.
NOTE:
An optional spacer may be installed to engage

the Work-Rite sooner when a load is applied. To install,

place between the Work-Rite and the face plate. If

the spacers are installed, use the 3/8"-16 x 2" bolts

instead of the 3/8"-16 x 1" bolts. There should be 1/4"

to 3/8" between the Work-Rite and the jounce stop.

See Figure “D”.

STEP 5— INSTALLING THE ASSEMBLY ONTO

THE VEHICLE

Select one spacer ring from your kit and place it around

the jounce bumper cup. Place the assembly against the

bottom of the jounce bumper cup and align the holes in

the face plate with the holes in the spacer ring. Place the

clamp rings on top of the space ring, aligning the holes.

Insert the 3/8"-16 x 1-1/2" flat head bolts into the tapered

holes on the face plate and secure to the clamp ring with

the flange lock nuts. See Figures “C” & “D”.

STEP 6— REATTACH THE SHOCK ABSORBER

Attach shock absorbers if removed earlier in the installation.

Torque to manufactures specifications.

STEP 7— ROUTE THE AIR LINE

Cut the remaining air line tubing into two equal lengths

(cut the tubing as squarely as possible). Select a location

for the inflation valves in a protected area, such as the

bumper or fuel fill floor (

Note: The inflation valve will be

installed in Step 8).

Insert the air line tubing into the push-to-connect fitting

on the air spring as far as possible. Route the tubing from

the air spring to the inflation valve, making sure to avoid

direct heat from the engine, exhaust pipe and away from

sharp edges. Secure with Nylon ties provided in your kit.

Figure “A”

Advertising