Step 8—install the air line and inflation valve, Step 9— inflate and test, Step 10— completion – Rite-Ride 4190 User Manual

Page 4

Advertising
background image

CLAMP RINGS,

SPACER RING,

FACE PLATE

1/4”-3/8”

WORK-RITE

AXLE

COIL-RITE

Figure “E”

NYLON TIES

AIR LINE

REAR

BUMPER

AIR LINE

PUSH-TO-CONNECT

INFLATION VALVE

FLAT WASHER

HEX NUT

VALVE CAP

BODY OF

VEHICLE

Figure “F”

STEP 8—INSTALL THE AIR LINE AND

INFLATION VALVE

Select a location on the vehicle for the air inflation valves.

The location can be located on the bumper or the body

of the vehicle, as long as it is in a protected location so

the valve will not be damaged, but maintain accessibility

for the air chuck see Figure “E”. Drill a 5/16" hole and

install the air inflation valve using two 5/16" flat washers

per valve as supports see Figure “F”.

FOLLOW STEPS 1-8 FOR THE OTHER SIDE OF
THE VEHICLE.

STEP 9— INFLATE AND TEST

Inflate the air springs to recommended operating pres-

sure (see page 1 for operating pressures). With a soap

and water solution, check for air leaks around the fittings

and valve core. We recommend inflating and deflating

in 5 psi increments to find the ideal riding condition for

your vehicle.

STEP 10— COMPLETION

This now completes the installation. Install. Raise the

vehicle and remove the jack stands and lower the vehicle

back onto the ground. Inflate the Coil-Rite air helper

springs to 5 psi.

NOTE: Check air pressure on a monthly basis.

Figure “D”

Advertising