Tweco 400 Ultra-Cut(October 2014) User Manual

Page 45

Advertising
background image

ULTRA-CUT 100 XT/200 XT/300 XT/400 XT

Manual 0-5264

INSTALLATION

3-19

3. Insert the fiber-optic cable connector into the receptacle on the vertically-mounted circuit board as shown.

Cable must snap into place.

Circuit Board

Fiber Optic Cable

Art # A-04773

4. Tighten the through-hole protector for the fiber-optic cable using hand tools.

5. Reinstall the Cover Panel making sure the ground wire is attached.

3.18 Gas Control Module: Control, Input, and Output Connections

1. Make all other connections to the rear of the Module. The connections are labeled. The Module must be

grounded; the grounding terminal is marked Use #10 AWG (European 6 mm

2

) (or thicker) wire for

grounding. Keep the ground wire as short as possible.

2. Position the Module on a flat, horizontal, mounting surface.

3. Ensure that the Flowmeters are plumb.

4. Secure the Module to the mounting surface.

5. Connect all gas / water inputs to the rear panel of the module.

6. Connect the appropriate control cables to terminals marked ‘TVA’ (torch valve assembly) and ‘power sup-

ply’.

Advertising
This manual is related to the following products: