25 complete the installation, Complete the installation -37 – Tweco 400 Ultra-Cut(October 2014) User Manual

Page 63

Advertising
background image

ULTRA-CUT 100 XT/200 XT/300 XT/400 XT

Manual 0-5264

INSTALLATION

3-37

3.25 Complete the Installation

1. Remove the cap from the coolant tank. Fill the coolant tank to the level shown, with Thermal Dynamics

coolant. The coolant level is visible through the translucent coolant tank. The amount of coolant required

varies with torch leads length.

Coolant Capabilities

Cat. Number and Mixture

Mixture

Protects To

7-3580 ‘Extra-CoolTM’

25 / 75

10° F / -12° C

7-3581 ‘Ultra-CoolTM’

50 / 50

27° F / -33° C

7-3582 ‘Extreme CoolTM’

Concentrate*

-65° F / -51° C

* For mixing with D-I CoolTM 7-3583

Art # A-11536

Fill Range

Coolant Tank

2. After the complete system has been installed, check that the coolant has been pumped through the system

as follows (see NOTE):

Advertising
This manual is related to the following products: