Shipping & packing, Ro-m, Start-up – Unger RO60S User Manual

Page 22

Advertising
background image

www.ungerglobal.com

22

H

i

F

lo

™ Ro-M

obile

Shipping & packing

4. Shipping & packing

The water treatment system has been carefully checked and packed prior to dispatch.
However, damage during shipment cannot be ruled out.
Thus, each system should be checked for intactness when accepting the goods while the
delivery person is present.

4.1. Receiving inspection

Check completeness of shipment by using illustration on page 7.
Perform visual inspection of the device for shipping damages, check manufacturing date
for observance of maximum shelf live.

The system must be put into operation at the latest 6 months after the manufacturing
date.

4.2 Claims

If device was damaged during shipping:

Report the damage to the company in whose name the shipping company delivered
the system to you.

Please save the packing material for return shipment (only if delivered by a
forwarding agent).

Claims based on shipping damage cannot be accepted without written confirmation of
the shipping company or in the case of unconditional acceptance!

5. Start-up

5.1 Initial start-up procedure to flush out the preserving agent

Before window cleaning can begin, the system must be disconnected from the
electric power supply and then thoroughly flushed to remove contamination,
sediments and preserving agents. This applies in particular after a longer standstill
or after preservation.

The water supply must always be started before the power is connected.

Check all hose connections and lines for tightness, since jolting during transport of
the system can result in possible leaks.

Advertising
This manual is related to the following products: