Streamline console, L packing list – ConnectPRO SL-18 User Manual

Page 5

Advertising
background image

StreamLine Console

l Packing List

These are required to install the StreamLine Console:
n StreamLine Console: assembled "LCD panel +

keyboard + mouse pad" drawer

n Rear bracket & extension kit: This kit contains two pieces of rear brackets and two pieces of aluminum

blocks. Make sure you have the correct kit to fit the depth of your cabinet. Note: the following length is
measured between "front pole and rear pole inside a rack cabinet" not the outside depth of a rack cabinet
enclosure.

RES-1

RES-2

RES-3

RES-4

Front Pole to rear pole distance

cm

inch

cm

inch

cm

inch

cm

inch

Minimum

49.5

19

1

/

2

57.5

22

5

/

8

67.5

26

5

/

8

77.5

30

1

/

2

Maximum

57

22

3

/

8

70.5

27

3

/

4

80.5

31

5

/

8

90.5

35

5

/

8

n KVM Switch: KVM module box can be connected to a StreamLine Console or be used as a stand-alone

KVM switch.

Module type

SK-01

SK-18

SK-28

SK-216

No. of console port

1

1

2

2

No. of computer port

1

8

8

16

KVM switch inside

No

Yes

Yes

Yes

n Bolt-and-nut set

n

User's manual

Advertising
This manual is related to the following products: