Appendix b - initial setup, Marker hose tips, Console installation – Great Plains NTA2007HD Operator Manual User Manual

Page 166: Monitor setup data, Weight transfer setup

Advertising
background image

162

Great Plains Manufacturing, Inc.

Contents

Index

NTA607/2007HD

166-283M

Contents

Index

04/04/2011

Appendix B - Initial Setup

Marker Hose Tips

If markers are not installed on the implement, perform
this check before hitching the air drill for the first time.

Inspect ports A and B at the hydraulic bulkhead at the
rear of the seed cart. If Female ORB to male QD cou-
plers are present in these ports, remove them and save
them for possible future use.

Fluid Spill Risk:
Do not connect or power the Marker hoses at the hitch if these
couplers are installed, or hydraulic fluid will be lost. The cou-
plers are provided for possible field installation of markers, or
for use with auxiliary implements such as augers.

Console Installation

The air drill’s standard seed monitor system includes a
virtual terminal that must be mounted in the tractor cab.
As supplied by DICKEY-john

®

, the kit includes a flat

bracket, and ball swivel.

The ball swivel includes four 10-32 screws. You or your
dealer must provide the mounting holes for the screws.
Your dealer may have alternate suction cup or clamping
brackets available if you prefer to avoid drilling holes.

Refer to the included DICKEY-john

®

manual for harness

connections.

Visibility Hazard:
Mount the console so that it is easy to monitor during planting,
but does not interfere with safe operation of the tractor in the
field or on public roads.

Monitor Setup Data

Refer to the DICKEY-john

®

Quick Start Guide (G.P. part

number 110011544).

Weight Transfer Setup

Prior to first folding operation, adjust the wing and cart
weight transfer circuits for nominal pressures. These cir-
cuits require some transfer pressure in order to operate
correctly in Fold and lift lock.

See “Weight Transfer Adjustments” on page 85.
Set the wing-transfer circuit to 250 psi.
Set the cart-transfer circuit to 100 psi.

MetaData: End of Appendix B - Initial Setup

Null4:

Figure 144

Hose Tips in Bulkhead Ports

31387

Null4:

Figure 145

IntelliAg

®

Terminal

26429

Null4:

Figure 146

Cart & Wing Transfer Valves

31192

Advertising
This manual is related to the following products: