Tank loading: quick-fill, Tank loading: top-fill, Refer to figure 44 – Great Plains NTA2007HD Operator Manual User Manual

Page 55

Advertising
background image

Great Plains Manufacturing, Inc.

Contents

Index

Operating Instructions

51

04/04/2011

Contents

Index

166-283M

Tank Loading: Quick-Fill
Complete step 1 through step 7 on page 50.

8.

Check that tank lids are secure.

9.

Connect the source supply line to the quick-fill
inlet

.

10. Open any shut-off valve at the source outlet line.

11. If the source is pumped, start the pump.

12. Open the cart inlet valve

.

13. Observe the sight gauge

(not shown) on the

tank(s) being filled. Do not fill above the
“200” (gallon) mark.

14. Close the source outlet shut-off valve, and if none,

close the cart inlet shut-off valve

.

15. Stop the source pump (if any). Close the cart inlet

shut-off valve

if not already closed.

16. Unless already at the field, close both tank discharge

valves

to prevent tank-to-tank transfers during

transport.

Tank Loading: Top-Fill
Complete step 1 through step 7 on page 50.

17. Deploy the ladder(s) as needed for access to the

tanks (page 42).

Refer to Figure 45
18. Unscrew the lid

on the tank to be filled.

19. Fill the tank. If filling both tanks from one tank, allow

time for the levels to balance.

20. Observe the sight gauge on the tank(s) being filled.

Do not fill above the “200” (gallon) mark.

21. Screw on lid. Return ladder to storage/transport

position.

Null4:

Null4:

Figure 44

Quick-Fill Inlet

31372

11

12

22

16

13

17

11

12

15

12

12

13

Null4:

Figure 45

Tank Lid Open for Filling

31390

1

1

Advertising
This manual is related to the following products: