Great Plains ADC2350BE Operator Manual User Manual

Page 3

Advertising
background image

Great Plains Manufacturing, Inc.

Cover

Index

iii

2012-08-01

Cover

Index

167-085M

©

Copyright 2006, 2007, 2008, 2009, 2012 All rights Reserved

Great Plains Manufacturing, Inc. provides this publication “as is” without warranty of any kind, either expressed or implied. While every precaution has been
taken in the preparation of this manual, Great Plains Manufacturing, Inc. assumes no responsibility for errors or omissions. Neither is any liability assumed for
damages resulting from the use of the information contained herein. Great Plains Manufacturing, Inc. reserves the right to revise and improve its products as
it sees fit. This publication describes the state of this product at the time of its publication, and may not reflect the product in the future.

Trademarks of Great Plains Manufacturing, Inc. include: Singulator Plus, Swath Command, Terra-Tine.

Registered Trademarks of Great Plains Manufacturing, Inc. include:

Air-Pro, Clear-Shot, Discovator, Great Plains, Land Pride, MeterCone, Nutri-Pro, Seed-Lok, Solid Stand,

Terra-Guard, Turbo-Chisel, Turbo-Chopper, Turbo Max, Turbo-Till, Ultra-Till, Verti-Till, Whirlfilter, Yield-Pro.

Brand and Product Names that appear and are owned by others are trademarks of their respective owners.

Printed in the United States of America

Table of Contents

Important Safety Information ......................................1
Safety Decals .................................................................6
Introduction ................................................................15
Air Cart Document Family ............................................15
Description of Unit ........................................................15

Intended Usage ........................................................16

Using This Manual........................................................16

Definitions.................................................................16

Owner Assistance ........................................................17
Preparation and Setup ...............................................18
Pre-Setup Checklist......................................................18
Installing Seed Monitor Terminal..................................18
Cart Drive System ........................................................19

Cart Sprocket Setup .................................................19

Hitching ........................................................................20

ADC2350/E Hitching.................................................20
ADC2350B/BE Hitching............................................20
ADC2350/E “Pull Between” Hitching ........................21

Hitching ADC2350/E to Tractor ............................21
Make ADC2350/E Seed Hose Connections .........22
Make ADC2350/E Electrical Connections ............23
Make ADC2350/E Hydraulic Connections ............24
Fan Priority ...........................................................24
ADC2350/E Hydraulic Hookup .............................24
Fan Priority ...........................................................25
Sump First and Last .............................................25
ADC2350/E Hydraulic Hookup .............................25

Hitching ADC2350B/BE to Leading Drill...................26

Make ADC2350B/BE Seed Hose Connections ....26
Make ADC2350B/BE Electrical Connections .......27
Make ADC2350B/BE Hydraulic Connections .......27
Fan Priority ...........................................................27

Set Up the Implement...............................................28

ADC2350B/BE Older Style Hoses With Color Ties ..

28

Fan Priority ...........................................................28

Setup Seed Monitor for Air Drill....................................29

Row Setup Data .......................................................29

Row Spacing and Swath ......................................29
CTA4000 Air Drill Implement ................................29
CTA4000HD Air Drill Implement ...........................29
NTA3010 Air Drill Implement ................................30

NTA3510 Air Drill Implement................................ 30
3N-4010HDA Air Drill Implement ......................... 30

Operating Instructions .............................................. 31
General Description ..................................................... 31
Pre-Start Checklist ....................................................... 31
Walkboard Ladders ...................................................... 32

Ladder Operation ..................................................... 32
Removing the Right Ladder ..................................... 32

Hopper Lids.................................................................. 33

Lid Opening.............................................................. 33
Lid Closing ............................................................... 33
Strainer..................................................................... 34

Meter Doors ................................................................. 35

Meter Door Opening................................................. 35
Meter Door Closing .................................................. 35

Meter Hand Crank........................................................ 36

Installing Crank ........................................................ 36
Operating the Hand Crank ....................................... 36

Drive Chain Lockout..................................................... 37

Locking Out for Transport ........................................ 37
Disengaging Lockout................................................ 37

Auger Operations ......................................................... 38

Deploying Auger....................................................... 38
Auger Hydraulic Controls ......................................... 39

Diverter Valve....................................................... 39
Auger Direction Valve .......................................... 39

Storing Auger ........................................................... 40
Auger Swing Arm ..................................................... 40

Transport...................................................................... 41

Minimum Towing Vehicle ......................................... 41
Pre-Transport Checklist ........................................... 43

Monitor Material Configuration ..................................... 43
Loading Material .......................................................... 44

Cart Diverter Valve................................................... 45

Unloading the Cart ....................................................... 47

Unloading Front Hopper........................................... 49
Unloading Rear Hopper ........................................... 50
Unloading Closeout.................................................. 52

Field Operations........................................................... 53

Single Hopper Operation.......................................... 53
Fan Speed................................................................ 53
Final Field Checklist ................................................. 54

Advertising
This manual is related to the following products: