Dry fertilizer assembly, 8 row planter, Assembly and setup – Great Plains PT8030 Parts Manual User Manual

Page 8

Advertising
background image

5

Assembly and Setup

10/14/08

PT6030 and PT8030 Pull-Type Planter 401-032Q

Great Plains Mfg., Inc.

Dry Fertilizer Assembly

1.

Reposition hopper supports (1) on the fertilizer bar so
the hoppers can be bolted to the supports. Refer to the
drawing for approximate dimensions in inches. You
may need to re-adjust the supports again when
mounting the hoppers.

8 Row Planter

15752

6 Row Planter

15751

2.

Remove a bearing (1) and retainer washer (2) from
one end of the auger shaft.

3.

Slide auger assembly (3) through hopper and fertilizer
outlets. Replace bearing (1) and retainer washer (2).

15755

4.

Make sure auger is assembled correctly. Tilt the hop-
per so you can see the auger. Using a wrench to rotate
the shaft, turn the shaft in the same direction the drill
will travel. Watch that the auger rotates so fertilizer will
be pushed to the outside. If fertilizer will be pulled to
the center of the hopper, remove auger shaft and re-
assemble properly.

15699

Advertising
This manual is related to the following products: