Install jackshaft assembly, Install chains, Meter drive chain – Great Plains 1005NT Assembly Instructions User Manual

Page 12: Install jackshaft assembly install chains, Ud b f

Advertising
background image

10

7ft and 10ft EWNT Small Seeds

Great Plains Manufacturing, Inc.

123-535M

06/02/2008

Install Jackshaft Assembly

Refer to Figure 8
37. Select one new:

123-509S

EWNT SGS JACKSHAFT SUB-ASSY

and 4 sets new:

802-079C HHCS 3/8-16X1 1/4 GR5
804-012C WASHER FLAT 3/8 SAE PLT
804-013C WASHER LOCK SPRING 3/8 PLT
803-014C NUT HEX 3/8-16 PLT

38. If the drill is equipped with fertilizer, temporarily dis-

connect the left two hoses. They are reconnected at
step 52.

39. Position the drive assembly at the extreme left and

front edges of the walkboard

. The location must

meet these two requirements:

a. The 27T input sprocket (lower right front, not visi-

ble in Figure) aligns with the 15T Small Seeds
drive sprocket on the clutch shaft. See Figure 12
on page 12.

b. At least four mounting plate holes align with walk-

board traction holes.

40. Insert four bolts

, two in the front rank of holes

and two in the back. Loosely secure with flat wash-
ers

, lock washers

, and nuts

.

Install Chains

Meter Drive Chain

Refer to Figure 9 (gray arrows show chain direction)
41. Select one new:

136-110D CHAIN RL #40 100 PITCHES

Open the chain if the ends are connected.

42. Route the opened chain around the 10T jackshaft

output sprocket, and in front of the 12T jackshaft
idler sprocket.

43. Route the chain over the 27T meter shaft input

sprocket.

44. Connect the chain ends. Follow the chain clip orien-

tation recommendation in Figure 22 on page 23.

Figure 8

Mount Jackshaft Assembly

10922

U

D

L

R

B

F

1

198

188

160

194

192

198

188

160

194

192

1

188

160

194

192

Figure 9

Meter Drive Chain

10949

200

200

U

D

B

F

198

199

200

Advertising