Installation instructions, Before you start, Tools required – Great Plains 1005NT Assembly Instructions User Manual

Page 7: Prepare drill, Dismount smv reflector, Caution

Advertising
background image

06/02/2008

123-535M

Great Plains Manufacturing, Inc.

Installation Instructions

5

Installation Instructions

Before You Start

Most accidents are the result of negligence and care-
lessness, usually caused by failure of the operator to fol-
low simple but necessary safety precautions. Allow no
one to install the small seeds attachment before carefully
reading this manual.

Due to evolving manufacturing practices, some sub-
assemblies may already be completely pre-assembled. If
so, check that fasteners are tight, and skip the unneeded
assembly steps.

Tools Required

• Basic hand tools, including hose clamp pliers

• Updated Parts Manual for the drill

• Drill and common fractional bit sizes, including

3

8

in

• Silicone sealant, weatherproof tape, or short

1

4

-20

fasteners for plugging box holes.

• Scaffold or ladder

• Two people for attaching seed box (3 preferred)

Torque values for fasteners are shown on page 36.

1.

Ensure drill is compatible with kit. See page 3.

2.

Read and understand “Important Safety Informa-
tion
” starting on page 1.

Prepare Drill

3.

If the drill to be updated has a Fertilizer box, clean
out the box per the instructions in the current drill
Operator Manual.

4.

Position the drill in a well lighted location suitable for
the installation. A clear surface beneath makes it
easier to recover any dropped parts.

5.

Lower the drill.

Dismount SMV Reflector

Refer to Figure 3
6.

Remove the fasteners securing the existing SMV
reflector to the rear of the main seed box. Save the
reflector and fasteners. It is re-mounted on a new
walkboard extension at step 86.

7.

Plug the previous mounting holes with silicone seal-
ant, weatherproof tape, or short

1

4

-20 fasteners.

Figure 3

Dismount Existing SMV

28004

!

CAUTION

Falling Hazard - Installation of the Small Seeds option reduces
clearance above the walkboard. Drills with Small Seeds
installed require more caution when working on their walk-
boards.

Advertising