320d, Installation – Aphex 320D Compellor User Manual

Page 10

Advertising
background image

320D

Compellor

Page 10

Page 11

4.1 Unpacking
Your Compellor was packed carefully at the factory in a container designed to protect the unit

during shipment. Nevertheless, Aphex recommends making a careful inspection of the ship-

ping carton and the contents for any signs of physical damage.

4.2 Damage & Claims
If damage is evident, do not discard the container or packing material. Contact your carrier

immediately to file a claim for damages. Customarily, the carrier requires you, the consignee,

to make all damage claims. It will be helpful to retain the shipping documents and the waybill

number.

4.3 Mains Voltage Selection And Fuse
Before applying power to the Compellor, it is a good idea to verify the correct mains voltage

setting. This is easily determined by looking through the transparent fuse cover on the rear

of the chassis.

AC Line power is supplied to the unit via an integral receptacle/fuse holder on the rear panel.

This receptacle meets the various international safety certification requirements, provides the

international mains power selection, and serves as a radio frequency line filter. The pro-

grammed voltage can be read near the left end of the fuse clip on the surface of the program-

ming card. If the incorrect voltage is seen, proceed to reprogram the voltage.

Reprogramming the mains voltage is easy if the following steps are followed. Remember to

check the fuse value and install the correct fuse as indicated.

4. Installation

1. Slide window open

2. Pry out “Fuse Pull”

3. Extract programming card

4. Arrange correct voltage to read in this position.

Fully re-insert the card by pressing firmly.

Programming Card

Side 1

Side 2

100

120

220

240

FUSE

PULL

FUSE DATA

100-120VAC

0.375 Amp

Slow Blow

220-240VAC

0.25 Amp

Slow Blow

Advertising