13 starting the vibrascout, Pp application, 14 software operation – Cooper Instruments & Systems Dytran 5340 USB Triaxial Accelerometer User Manual

Page 17

Advertising
background image

 
 

  

REV B 10/18/12, ECN 8972

 

 

17 

 

Figure 22: Installation Completed 

13 Starting the VibraScout

PP application

After System reboot, from the Desktop, double click the VibraScout

™ 

PP icon.  

 

14 Software Operation

I.

Software Revision 
Press F1 key on the keyboard or navigate to Help>About to display the current version and date of 
the Software. See Figure 23 for location on window. Press anywhere on the window to hide it. 

 

 

Figure 23: Software Revision 

Advertising