Install the header bracket, Ceiling header bracket installation, Installation step 2 – Craftsman 315 SERIES 139.53939D User Manual

Page 13

Advertising
background image

13

Lag Screws
5/16"x9x1-5/8"

– Finished Ceiling –

Door
Spring

Header Wall

UP

Ceiling Mounting Holes

6" (15 cm) Maximum

Header

Bracket

Vertical
Centerline
of Garage Door

Garage Door

Vertical Centerline
of Garage Door

INSTALLATION STEP 2

Install the Header Bracket

You can attach the header bracket either to the wall
above the garage door, or to the ceiling. Follow the
instructions which will work best for your particular
requirements. Do not install the header bracket over
drywall. If installing into masonry, use concrete
anchors (not provided).

WALL HEADER BRACKET INSTALLATION

• Center the bracket on the vertical centerline with the

bottom edge of the bracket on the horizontal line as
shown (with the arrow pointing toward the ceiling).

• Mark the vertical set of bracket holes. Drill 3/16" pilot

holes and fasten the bracket securely to a structural
support with the hardware provided.

Lag Screw
5/16"-9x1-5/8"

HARDWARE SHOWN ACTUAL SIZE

CEILING HEADER BRACKET INSTALLATION

• Extend the vertical centerline onto the ceiling as

shown.

• Center the bracket on the vertical mark, no more than

6" (15 cm) from the wall. Make sure the arrow is
pointing away from the wall. The bracket can be
mounted flush against the ceiling when clearance
is minimal.

• Mark the side holes. Drill 3/16" pilot holes and fasten

bracket securely to a structural support with the
hardware provided.

UP

Wall Mount

Optional
Mounting Holes

Lag Screws
5/16"x9x1-5/8"

Highest Point of
Garage Door Travel

Vertical
Centerline
of Garage Door

Header
Wall

Garage
Door

Door Spring

2x4
Structural
Support

Vertical
Centerline
of Garage Door

Header

Bracket

Horizontal
Line

Advertising