Carrier WEATHERMASTER 48/50Z030-105 User Manual

Page 51

Advertising
background image

51

Table 40 — Run Status Cool Display

SumZ Operation — The SumZ algorithm is an adaptive PID

style of control. The PID is programmed within the control and

the relative speed of staging can only be influenced by the user

through the adjustment of the Z.GN configuration, described in

the reference section. The capacity control algorithm uses a

modified PID algorithm, with a self adjusting gain which

compensates for varying conditions, including changing flow

rates across the evaporator coil.

Previous implementations of SumZ made static assump-

tions about the actual size of the next capacity jump up or

down. This control uses a “rise per percent capacity” technique

in the calculation of SumZ, instead of the previous “rise per

stage” method. For each jump, up or down in capacity, the

control will know beforehand the exact capacity change

brought on. Better overall staging control can be realized with

this technique.
SUM Calculation — The PID calculation of the “SUM” is

evaluated once every 80 seconds.
SUM = Error + “SUM last time through” + (3 * Error Rate)

Where:

SUM = the PID calculation
Error = EDT – Cooling Control Point
Error Rate = Error – “Error last time through”
NOTE: “Error” is clamped between –10 and +50 and “Error

rate” is clamped between –5 and +5.

This “SUM” will be compared against the “Z” calculations

in determining whether cooling stages should be added or

subtracted.
Z Calculation — For the “Z” calculation, the control attempts

to determine the entering and the leaving-air temperature of the

evaporator coil and based upon the difference between the two

during mechanical cooling, determines whether to add or

subtract a stage of cooling. This is the adaptive element.

The entering-air temperature is referred to as MAT

(mixed-air temperature) and the leaving-air temperature of the

evaporator coil is referred to as EDT (evaporator discharge

temperature). They are found at the local display under the

Temperatures

CTRL sub-menu.

The main elements to be calculated and used in the calcula-

tion of SumZ are:
1) the rise per percent capacity (R.PCT)
2) the amount of expected rise for the next cooling stage

addition

3) the amount of expected rise for the next cooling stage

subtraction

The calculation of “Z” requires two variables, Z.PLU used

when adding a stage and Z.MIN used when subtracting a stage.

They are calculated with the following formulas:
Z.PLU = Z.GN * (10 + (4*(–ADD.R))) * 0.6
Z.MIN = Z.GN * (–10 + (4*(–SUB.R))) * 0.6

Where:

Z.GN = configuration used to modify the threshold levels used

for staging (Configuration

COOL

Z.GN)

ADD.R = R.PCT * (C.CAP – capacity after adding a cooling

stage)
SUB.R = R.PCT * (C.CAP – capacity after subtracting a cool-

ing stage)

Both of these terms, Z.PLU and Z.MIN, represent a thresh-

old both positive and negative upon which the “SUM” calcula-

tion must build up to in order to cause the compressor to stage

up or down.
Comparing SUM and Z — The “SUM” calculation is com-

pared against Z.PLU and Z.MIN.

• If “SUM” rises above Z.PLU, a cooling stage is added.

• If “SUM” falls below Z.MIN, a cooling stage is subtracted.

There is a variable called SMZ which is described in the

reference section and which can simplify the task of watching

the demand build up or down over time. It is calculated as

follows:

If SUM is positive: SMZ = 100*(SUM/Z.PLU)
If SUM is negative: SMZ = –100*(SUM/Z.MIN)

Mixed Air Temperature Calculation (MAT) — The mixed-

air temperature is calculated and is a function of the economiz-

er position. Additionally there are some calculations in the con-

trol which can zero in over time on the relationship of return

and outside air as a function of economizer position. There are

two configurations which relate to the calculation of “MAT”.

These configurations can be located at the local display under

Configuration

UNIT.

ITEM

EXPANSION

RANGE

UNITS

CCN POINT

WRITE STATUS

COOL

COOLING INFORMATION

C.CAP

Current Running Capacity

%

CAPTOTAL

CUR.S

Current Cool Stage

COOL_STG

REQ.S

Requested Cool Stage

CL_STAGE

MAX.S

Maximum Cool Stages

CLMAXSTG

DEM.L

Active Demand Limit

%

DEM_LIM

forcible

SUMZ

COOL CAP. STAGE CONTROL

SMZ

Capacity Load Factor

-100 – +100

SMZ

ADD.R

Next Stage EDT Decrease

^F

ADDRISE

SUB.R

Next Stage EDT Increase

^F

SUBRISE

R.PCT

Rise Per Percent Capacity

RISE_PCT

Y.MIN

Cap Deadband Subtracting

Y_MINUS

Y.PLU

Cap Deadband Adding

Y_PLUS

Z.MIN

Cap Threshold Subtracting

Z_MINUS

Z.PLU

Cap Threshold Adding

Z_PLUS

H.TMP

High Temp Cap Override

HI_TEMP

L.TMP

Low Temp Cap Override

LOW_TEMP

PULL

Pull Down Cap Override

PULLDOWN

SLOW

Slow Change Cap Override

SLO_CHNG

ITEM

EXPANSION

RANGE

CCN

POINT

DEFAULTS

UNIT

UNIT CONFIGURATION

MAT.S

MAT Calc Config

0 - 2

MAT_SEL

1

MAT.R

Reset MAT Table
Entries?

Yes/No

MATRESET No

Advertising