42 gw, Motorized valve and control, Electrical connections – Carrier 42GW User Manual

Page 12: Standard version unit - control panel, Gb - 11

Advertising
background image

GB - 11

42 GW

E N G L I S H

Motorized valve and control

• If these connections are not made as described the drain

pan condensate may overflow.

• Valves should only open when the fan motor is working, i.e.

when one of TB1 terminals 1 or 2 or 3 is supplied from TB1
terminal 4.

• The optional electric heater (mod. 42GWE) which can only be

factory installed, must only be energized when the fan is
working.

• The optional electric heater which must be factory installed on

model 42GWE, works only if TB1 terminals 5-6 are supplied
from TB1 terminal 4.

• The water discharge pump should work every time the

cold water valve is opened, supplying TB1 terminal 7 and
8 from TB1 terminal 4.

• When the system is filled with water, verify all couplings

for tightness.

• The manufacturer does not accept responsibility for the

tightness of the field - installed valve assembly and this
is not tested in the factory. He declines any responsibility
for non functioning of these assemblies and for damage
due to dripping.

Electrical connections

Capacitor

Ground connection screw

Board

Relay board E-HTR (only on
models with electric heater)

Holes for panel fixing screws

Auxiliary board (accessory)

C

B

A

CV

CG

CP

STANDARD version unit - Control panel

CV

CG

CP

C

A

B

A. Electric heater supply connection

B. Unit power supply connection

C. Polarised connector

mod. 004 - 008 - 010

mod. 012 - 016 - 020

CV

CG

CP

Fan connector

Float connector

Pump connector

We recommend to remove the main board from the electric
panelboard for better access to electric connections.

Advertising