Assembly step 2 – CFM Corporation 3405BG User Manual

Page 6

Advertising
background image

6

Locate these parts:

Assembly Step 2

Tools needed:

Hardware:

Phillips head
screwdriver

Hardware Bag

1/4-20 x 5/8” Bolts
16 Required

A

1. Set the cabinet assembly top side

down. Be sure to remove all loose
inner packages. To prevent scratch-
ing or damaging your smoker, set the
cabinet on a padded surface such as
cardboard or carpet. The top of the
cabinet has the vent holes; the bottom
has mounting holes for the legs.

2. For each leg, line up the holes and

insert the bolts. Nuts are pre-welded
to the cabinet.

IMPORTANT: The leg that contains an
extra hole on its side must be mounted at
the front in the position shown. This hole
will be used to secure the gas hose to
the leg with a zip tie.
3. DO NOT yet insert the two (2) bolts

in the locations indicated. These two
bolts will be used in the next assembly
step.

Cabinet
Assembly

4 Legs

����
�����������
����

Leg with
Extra Hole

Advertising
This manual is related to the following products: