Samson DOUBLE BRAID Class II Eye Splice Modified for TS-II and TS-II Premium User Manual

Page 2

Advertising
background image

PAGE 2 OF 5

SamsonRope.com

| Email

[email protected]

| Tel

+1.360.384.4669

Double Braid Class II Eye Splice Modified for TS-II and TS-II Premium

S A M S O N S P L I C I N G I N S T R U C T I O N S

Bend rope sharply at Mark 3. Using an awl or

similar device, carefully pry the cover strands apart

to create an opening. Using the awl, carefully pry

the core out of the cover. Make sure the pin placed

between Marks 2 and 3 stays in place.

3

step

Mark 3

Mark 2

e x t r a c t i n g t h e c o r e

3

A

With rope positioned as shown,

pull on core in the direction shown.

You will need to expose a minimum

of 3 fid lengths of core.

4

A

Bend the primary (load bearing)

core sharply at Mark B. Carefully

pry the strands apart to expose the

control (inner) core. Carefully pry the

control core out of the primary core,

and pulling in the direction shown,

completely remove it.

Find the mark on the core made previously

through the cover at Mark 3. This is Mark A.

From Mark A, measure back a distance of

1-1/4 fid lengths, make Mark B. From Mark B,

measure back a distance of 1-1/2 fid lengths

and make Mark C.

4

step

Pull

3 fid lengths

Mark 3

Mark 2

Mark 1

Mark a

Mark c

Mark B

1-1/4 fid lengths

1-1/2 fid lengths

Mark 3

Mark 2

Mark 1

Mark a

Mark c

Mark B

Primary core

control core

Pull

Mark 3

Mark 2

Mark 1

M a r k i n g t h e c o r e

Advertising