Installation step 3, Attach the rail to the header bracket – Chamberlain 2500B User Manual

Page 11

Advertising
background image

Header Bracket

Belt Pulley Bracket

Opener Carton or
Temporary
Support

Header Wall

Garage
Door

Clevis Pin
5/16"x2-3/4"

Ring Fastener

Torsion
Spring

Rail

Clevis Pin
5/16"x2-3/4"

Ring Fastener

Header Bracket

Belt Pulley
Bracket

Foam Packaging

Rail

11

HARDWARE SHOWN ACTUAL SIZE

INSTALLATION STEP 3

Attach the Rail to the Header
Bracket

• Position the opener on the garage floor below the

header bracket. Use packing material as a
protective base. NOTE: If the door spring is in the
way you’ll need help. Have someone hold the
opener securely on a temporary support to allow
the rail to clear the spring.

• Position the rail bracket against the header

bracket.

• Align the bracket holes and join with a clevis pin

as shown.

• Insert a ring fastener to secure.

Advertising