Unassembled parts, Assembly/pre-operation, Tools required for assembly – Craftsman 917.28922 User Manual

Page 7: To remove tractor from, Carton, Unpack carton, Check battery, To adjust seat

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

UNASSEMBLED PARTS

Keys

(2) Keys

(1) Oil Drain Tube
For Future Use

Slope Sheet

ASSEMBLY/PRE-OPERATION

Your new tractor has been assembled at the factory with the exception of those parts left

unassembled for shipping purposes. To ensure safe and proper operation of your tractor
all parts and hardware you assemble must be tightened securely. Use the correct tools as
necessary to insure proper tightness.

TOOLS REQUIRED FOR ASSEMBLY

A socket wrench set will make assembly

easier. Standard wrench sizes you need
are listed below.

(1) 3/4" wrench

(1) Pliers

(1) 1/2" wrench

(1) Utility knife

(1) Tire pressure gauge

When right or left hand is mentioned in this

manual, it means whenyouareintheoperating
position (seated behind the steering wheel).

TO R E M O V E T R A C T O R F R O M
CARTON

UNPACK CARTON

1. Remove all accessible loose parts and

parts boxes from carton.

2. Cut along dashed lines on all four panels

of carton. Remove end panels and lay
side panels flat.

3. Check for any additional loose parts or

cartons and remove.

CHECK BATTERY

1. Lift seat pan to raised position.

NOTE: Ifthis battery is put into service after
month and year indicated on label (label
located between terminals) charge battery

for minimum of one hour at 6-10 amps. (See

"BATTERY" in Maintenance section of this
manual for charging instructions).

Seat pan

Label

Terminal

erminal

TO ADJUST SEAT

Grasp adjustment handle (A) and pull up,
slide seat to desired position and release
adjustment handle.

Advertising