Preparation of chassis, Installation kits contents, Suggested tool requirements – LG L1810ER User Manual

Page 13

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Installation

Installation Kits Contents

NO.

NAME OF PARTS

Q'TY

1

FRAME CURTAIN

2

2

SUPPORT BRACKET

2

3

SILL BRACKET

2

4

LOCK NUT

4

5

SCREW (TYPE A)

11

6

SCREW (TYPE B)

7

7

SCREW (TYPE C)

5

8

SCREW (TYPE D)

2

9

CARRIAGE BOLT

2

10

FOAM STRIP

1

11

FOAM SEAL

1

12

WINDOW LOCKING BRACKET

1

13

DRAIN PIPE

1

14

FRAME GUIDE

2

Suggested Tool Requirements

SCREWDRIVER(Philips and Platead), RULER, KNIFE, HAMMER, PENCIL, LEVEL

PREPARATION OF CHASSIS

1j

Remove the screws which fasten the cabinet at both

sides and at the back.

^ Siide the unit from the cabinet by gripping the base pan

handle and puliing forward while bracing the cabinet.

^ Cut the window sash seal to the proper length.

Peel off the backing and attach the Foam-Seal ® to the

underside of the window sash.

^ Insert the Frame Guides ® into the bottom of the

cabinet.

^ Insert the Frame Curtain (3) into the Upper Guide and

Frame Guides®.

^ Fasten the curtains to the unit with 10 Type

A screws (5).

Shipping
Screws

Owner's Manual 13

Advertising