Acolyte RibbonLyte in Recessed Channel User Manual

Page 4

Advertising
background image

All artwork and images copyright Acolyte Industries Inc.

Use or reprinting prohibited unless explicitly approved by Acolyte Industries.

I N S TA L L AT I O N - - S T E P S 5 - 8

5

7

6

8

PA G E 3

Clean the mountain surface free of dust
and debris using a wet cloth. For metal
mounting surfaces use rubbing alcohol (C)
to wipe clean.

After surface is dry, apply 1/16” double-sided
tape (D) to the desired mounting path of
your RibbonLyte in your channel.

(D)

Remove backing from double-sided tape
(D).

(D)

Remove the backing from the RibbonLyte
(E) that you are going to be applying atop
the double-sided tape.

(C)

(E)

Advertising
This manual is related to the following products: