Alumax 750D User Manual

Page 7

Advertising
background image

EPH-N00-06060

12-10-04

Page 7 of 8

10

12

Locate one of the clear panel guides [T] in

the middle of the tub track [B] with the door
panels in the position shown. With a 7/64" bit,
drill a hole into the V-groove through the mounting
hole in the guide. Attach the center panel guide
with a #6 x 3/8" pan head screw [U] thru the drilled
hole.

OPTION: Included in your hardware kit are two
extra panel guides and screws that can be used in
the center of each opening if desired.

11

Peel the protective backing from the self-stick

tape on the molded jamb covers [G]. Attach the jamb
covers to the upper end of the wall jambs [A] as shown to
cover the tooling notches.

Neatly caulk each end of the tub track [B]

where it meets the wall jambs [A] and along the
interior edge of the wall jambs as shown. Run a
bead of caulking along the interior edge of the tub
t r a c k .

NOTE: The caulking should be allowed to cure for
twenty-four hours before using your new bath
enclosure.

Advertising
This manual is related to the following products: