Figure 3-3 – Cabletron Systems Smart 04-0053-01 User Manual

Page 52

Advertising
background image

3-8 SmartSwitch ATM User Guide

Multi-level PNNI Topology

PNNI Routing

2.

Add a third node (at level 64) to either switch SWA3 or SWB3.

3.

Use the

set pnnipglelection

command to designate the switch’s second node (not third) as the

PGL for the parent peer group, and specify the third node as the parent node of the second.

4.

Perform steps 2 and 3 for switches with the same role in the other level 72 parent groups.

These steps create a grandparent group at level 64, and establishes a virtual link between the LGNs that represent the
LGNs at level 72 (see Figure 3-3).

Figure 3-3 Adding a third PNNI node for next level connectivity

PGL

PGL

PGL

PGL

PGL

PGL

Level 80

Level 72

Level 64

First nodes

Second node

Third node

Virtual Link

Virtual Link

Virtual Link

SWA3

SWA3

SWA3

SWB3

LGN

LGN

Parent Groups

Grandparent Group

Lowest Peer Groups

Advertising