Installing the ce drum guards-pit, Installing the ce drum guards—pit – Dynojet 224: CE Package User Manual

Page 12

Advertising
background image

CE Package Installation Guide for 224 Automotive Dynamometers

C E P A C K A G E
CE Drum Guards—Pit

8

I

NSTALLING

THE

CE D

RUM

G

UARDS

—P

IT

The CE Drum Guards are secured to the dyno’s pit covers. The following instructions
are for the 224 pit dyno. If you have a 224 above ground dyno please refer to
“Installing the CE Drum Guards—Above Ground” on page 4.
1

Secure the front and rear CE drum guards to the two long pit covers using ten
1/4-20 x 5/8" panhead screws.

Figure 7: Securing the Front/Rear Drum Guards to the Long Pit Covers

2

Secure the side CE drum guards to the two end pit covers using four 1/4-20 x
nylock nuts.

Figure 8: Securing the Side Drum Guards to the End Pit Covers

screw

long pit cover

front/rear

drum guard

SA089

side drum guard

end pit cover

nylcck nut

stud

Advertising