EFCO 5XPT Series User Manual

Page 10

Advertising
background image

EFCO CORPORATION 2/11/2013 PART NO. YW44

Page 10 of 34

5XPT SLIDING GLASS DOOR INSTALLATION INSTRUCTIONS

B. Sill Starter Installation






















3S91 SILL STARTER 3S90 SILL STARTER







1. Determine the cut length (cut length = [overall F.D. + 1/8”], unless shown otherwise) of the

sill starter and cut to length. Adhere H10F gasket to the FE71 end dam and attach to 3S91
sill starter with SLQ9 (#10-16 x 1” PL-PH-SMS 410 A pt MG) screws. This will need to be
done to both sides of the sill starter. Note: 3S90 sill starter, when supplied, will have FE72
end dam wrap underneath the sill starter. (See Fig. E)


SLQ9
SCREWS

FE71 END DAM

H10F GASKET

Fig. E

FE72 END DAM

3S90 SILL
STARTER

3S91 SILL
STARTER

If you have ordered your sill starter in stock lengths, to be cut and

fabricated in the field, it is required of the installer to seal and tool

across the top of the insulating struts of the starter sill.

Sealant by installer if

sill starter is ordered
stock length

Advertising