EFCO 5XPT Series User Manual

Page 30

Advertising
background image

EFCO CORPORATION 6/8/2012 PART NO. YW44

Page 30 of 34

5XPT SLIDING GLASS DOOR INSTALLATION INSTRUCTIONS

14. With the sealant all applied, the operable panel is now ready to load with the exception of

driving on the sash stop.


Before loading the operable panel, the sash stop must be driven into the hollow of the head

end of the meeting rail as shown. (See Fig.13) There will be a groove cut in the sash stop.
This groove will line up with the outer web of the meeting rail.


























15. Locate HNE3 and 18M9 door stop. (See Fig. 14) Slide the two parts together. Apply a small

amount of silicone to the back 18M9 and snap fit into the jamb along the top side of the sill
roller track. This operation can be done after the door is fully assembled.


















Fig. 13

Fig 13

Fig. 14

18M9

HNE3

Apply a small
amount of
silicone to the
back side before
snapping into the
jamb.

Advertising