Home Legend Hardwood and Bamboo T-molding User Manual

Page 5

Advertising
background image

Doc.ID: 095

Effective: 2-11-2013

Title: Installation Hardwood/Bamboo Stair Nose

Rev.:2

Hardwood/Bamboo Stair Nose

The stair nose trim piece covers the front edge of the stair tread. The stair tread is usually covered with the same

floor covering as the connecting floor. The result is stairway which coordinates with the rest of the floor in the

house.

The back end of the stair noses are built in two profiles. One profile is

a

“grooved” and the other is “stepped.” This installation procedure

describes the step profile. The step of the stair nose rests on the

tongue of the floor. For the groove profile, the method is similar, but

the groove of the stair nose is mated to the tongue of the floor.

Step 1.

Take a stair nose molding piece and place it on the edge of the step,

where it will be installed. Place the flooring plank to be used as the

new stair tread against the stair nose. Mark at where the position of

the floor as indicated in diagram.

Step 2.

Remove the pieces.

Step 3.

Apply several beads of flooring adhesive or construction adhesive to the

surface of the stair tread. This is to bond the flooring plank to the surface

of the stair tread, thereby making it the new stair tread, to match with

the stair nose that will be installed.

Advertising