Home Legend Hardwood and Bamboo T-molding User Manual

Page 8

Advertising
background image

Doc.ID: 120

Effective: 2-18-2013

Title: Installation Hardwood/Bamboo Hard Surface Reducer

Rev.:0

Step 5.

Allow the glue to cure. Follow glue manufacturer’s recommendation.

Step 6.

Installation is complete and the floor can be placed in service.

Step 7.

Prevent damage. When moving heavy object across the hard surface reducer, do not drag the heavy object

across the top of it. Place plywood board over it and roll the object on the plywood.

Advertising