07_reliance, Reliance fabrication, Figure 6 – Oldcastle BuildingEnvelope Solar Eclipse User Manual

Page 7: Figure 5

Advertising
background image

7






S U N C O N T R O L - I N S T A L L A T I O N M A N U A L

SOLAR ECLIPSE

FIGURE 6

Notch top of lower caps

and bottom of upper caps

as shown

.

612"

1

5

16

"

15

16

"

1

4"

R18"

15

16

"

\pxql;Drill 7/16" dia.

holes

(4) places

1

5

16

"

5

8"

212"

1 3

32"

5

16"

314"

Front

View

Side

View

Reliance Fabrication

FIGURE 5

Mill center of mullion tongue

for shade anchor

Centerline of

Sunshade Anchor

Centerline of

Sunshade Anchor

2.1 Fabrication

8) Locate the centerline of each sunshade anchor. A 1/4" wide x 6-1/2" long cutout must be

milled into face of mullion tongue as shown in upper detail of FIGURE 5. The standard

sunshade anchor (WW-107-01) for Reliance Curtain Wall will require (4) four 7/16" clear

holes for attachment. See FIGURE 5 for hole locations. ( Size, locations and quantity of bolts

may vary based on project requirements, consult engineer for specific applications.)

9) Face caps must be notched to clear anchor. Face caps are cut at centerline of sunshade,

notched on ends. Notch per FIGURE 6.

Installation Notes:

1) Face cap will be notched above and

below anchor. See FIGURE 6.

2) Slide cap over anchor and snap into

position.

3) Butt splice cap at centerline of

anchor.

Note: WW-110 face cap shown, notch

similar for custom applications.

Advertising