Pw90-installation – Oldcastle BuildingEnvelope PW-180 User Manual

Page 3

Advertising
background image

JULY 2011

2

Phone: 1-866-OLDCASTLE (653-2278)

Web Address: www.oldcastlebe.com

1.

A). OBTAIN BENCH MARKS AT EACH
JAMB (4’0” FROM FINISHED FLOOR)
FROM GENERAL CONTRACTOR.

B). CHECK OPENING FOR WIDTH
AND HEIGHT.

C). CHECK JAMBS FOR PLUMB.

A). DOUBLE CHECK SHIPMENT BY

2.

LAYING OUT TRACK & ACCESSORIES

IN ACCORDANCE WITH ASSEMBLY

PRINT AND ACCESSORY LISTS.
B). TAILS OF TOP SWITCH MUST FACE

SAME DIRECTION AS FLOOR SWITCH.

A). LOCATE THE START OF SWITCH ON

SHOP DRAWING OR DATA SHEET.

3.

B). ESTABLISH DIMENSION OF TRACK

CENTER LINE TO LOCK JAMB ON SHOP

DRAWINGS OR DATA SHEET. C). INSTALL

FLOOR SWITCH AND TRACKS STARTING AT THE

“START OF SWITCH POINT AND LOCK JAMB. D).

SET TOP OF TRACK WITH FINISHED FLOOR AND

LEVEL WITHIN 1/8” – USE TRANSIT OR WATER

LEVEL AND LEVELING WEDGES. E). PACK

QUICK DRYING CEMENT AROUND ALL TRACK

ANCHOR STRAPS AND SWITCHES. F). DO NOT

SET PANELS UNTIL CEMENT IS HARD.

A). INSTALL TOP TRACK LEVEL AND

4.

PLUMB WITH BOTTOM TRACK.
B). USE A STORY POLE TO HOLD

VERTICAL OPENING DIMENSION

TO +1/4” TO –0”.

P W - 9 0 S L I D I N G M A L L F R O N T

I N S T A L L A T I O N I N S T R U C T I O N S

Advertising