Rice Lake 920i Panel Mount User Manual
Panel mount enclosure installation instructions, 920i, Programmable hmi indicator/controller
March 2014
69989 - Rev A
920i
®
Programmable HMI Indicator/Controller
Panel Mount Enclosure Installation Instructions
This document contains drawings and instructions for
installing panel mount models of
920i
indicators. See
the
920i
Installation Manual, PN 67887, for general
installation and configuration and calibration
information.
WARNING
The
920i
has no on/off switch. Before
opening the unit, ensure the power cord
is disconnected from the power outlet.
CAUTION
•
Use a wrist strap to ground yourself and protect
components from electrostatic discharge (ESD) when
working inside the indicator enclosure.
•
Procedures requiring work inside the indicator must be
performed by qualified service personnel only.
•
The supply cord serves as the power disconnect for the
920i
. The power outlet supplying the indicator must be
installed near the unit and be easily accessible.
PANEL CUTOUT
(DASHED LINE)
INTERIOR HOUSING
(DOTTED LINE)
8.02"
9.16"
11.56"
10.51"
OUTER PERIMETER OF
EXTERIOR FACEPLATE
(SOLID LINE)
Figure 1. Panel Cutout for Panel Mount Enclosure