Cable Grounding

All cables routed into the panel mount enclosure

should be grounded against the indicator enclosure. Do

the following to ground shielded cables:

Use the lockwashers, clamps, and kep nuts

provided in the parts kit to install grounding

clamps on the enclosure studs adjacent to cord

grips.

Insulated cable

Foil (silver side out)

Grounding clamp

Shield wire (cut)

Length of foil before folding
back on cable insulation

Cut insulation here
for foil-shielded cables

Braid

Cut insulation here
for braided cables

Install lockwashers first,
against enclosure, under
grounding clamp

BRAIDED CABLE

FOIL-SHIELDED
CABLE

Figure 5. Grounding Clamp Attachment for Foil-Shielded

and Braided Cabling

Grounding clamp

Install lockwashers first,
against enclosure, under
grounding clamp

Cabling bar

Use cable ties to
bind cables to bar

Grounding clamp stud

Figure 6. Cable Installation with Grounding Clamp

Route cables under cabling bar (see Figure

6)

and through grounding clamps to determine

c a b l e l e n g t h s r e q u i r e d t o r e a c h c a b l e

connectors. Mark cables to remove insulation

and shield as described below:

For cables with foil shielding, strip insulation

and foil from the cable half an inch (13 mm)

past the grounding clamp (see Figure 5). Fold

the foil shield back on the cable where the

cable passes through the clamp. Ensure silver

(conductive) side of foil is turned outward for

contact with the grounding clamp.

For cables with braided shielding, strip cable

insulation and braided shield from a point just

past the grounding clamp. Strip another half

inch (13 mm) of insulation only to expose the

braid where the cable passes through the

clamp.

For load cell cables, cut the shield wire just

past the grounding clamp. Shield wire function

is provided by contact between the cable shield

and the grounding clamp.

Route stripped cables under cabling bar and

through the clamps. Ensure shields contact

grounding clamps. Tighten grounding clamp

nuts.

Use cable ties to secure cables to cabling bar.

Power Specifications

Line Voltages

115 or 230 VAC

Frequency

50 or 60 Hz

Maximum Power Consumption, 65W on secondary

Primary power consumption: 100W TRMS
Constant current:

1.5 A TRMS (115VAC);
1.0 A TRMS (230VAC)

See the

920i

Installation Manual for additional

specifications.

Parts Kit Contents

Table 1 lists the parts kit contents for the panel mount

version of the

920i

.

Table 1.Parts Kit Contents

PN

Description

14626

Kep nuts, 8-32NC (5)

54206

Machine screws, 6-32 x 3/8 (2)

15133

Lock washers, No. 8, Type A (5)

71522

Machine screws, 8-32NC x 1/4 (6)

82425

Machine screws, 10-32NF x 1-1/2 (9)

15631

Cable ties (4)

53075

Cable shield ground clamps (5)

94422

Capacity label (1)

15887

6-position screw terminal for load cell
connection (1)

77180

Connector, 8-position screw terminal (1)

70599

6-position screw terminals for J2 and J10 (1)

71126

4-position screw terminal for J9 and optional
keyboard connection (2)

71125

3-position screw terminal for J11 (1)