0 indicator installation, 1 indicator installation – Rice Lake Dialysis Scale - SD-1150-WP User Manual

Page 13

Advertising
background image

SD-1150-WP Installation & Operation Manual - Indicator Installation

9

5.0

Indicator Installation

5.1

Indicator Installation

The Summit SD-1150-WP Dialysis Scale has several connections on the back of the indicator. Connection points

include:

AC power connection

RS-232 port connection

Scale connection port

Adapter storage connection

AC Power Connection

The Summit SD-1150-WP Scale has an optional 120 VAC adapter or 230 VAC adapter to use when power is

readily available. The optional AC power adapter plugs into the back of the indicator as shown in Figure 5-1.

Figure 5-1. AC Power and Load Cell Connection Points

The Summit SD-1150-WP Scale is capable of running its internal sealed lead-acid rechargeable battery if no

additional power source is available. Battery life is approximately 75 hours. If the

LO Bat

indicator is showing on

the display, recharge the battery or connect the scale to an AC power source as soon as possible for accurate

weighing.

Battery Charging

When the optional AC adapter is connected to a power source, the rechargeable battery goes into recharge mode.

To maintain battery longevity we recommend you charge it on a regular basis rather than waiting until it
is fully discharged.

The LED indicator light on the back of the scale housing will illuminate red during the charging period, and

change over to green when the battery becomes fully charged.

Load Cell Connections

Figure 5-1 illustrates where the load cell connection point is.

Connect the optional
A C p o w e r s o u rc e
here.

R S - 2 3 2
Connection

U S B 2
Connection

Load cell connection
under the cover.

Note

Advertising