SD-1150-WP Installation & Operation Manual - Scale Installation

3

3.0

Scale Installation

The following sections describe the correct installation procedures when installing the Summit SD-1150-WP

Dialysis Scale.

3.1

Overview

Standard installation of the Summit SD-1150-WP Dialysis Scale consists of the following steps:

1. Select a site.
2. Unpack the scale and pit frame.
3. Install the pit frame.
4. Lower the scale into pit frame.
5. Adjust the four leveling feet on the scale.
6. Connect cable to the indicator.
7. Calibrate the scale.

3.2

Site Preparation

The scale must not be loaded beyond its capacity, even momentarily. Avoid areas where the scale might receive

damaging side impacts from wheels, or shock damage from falling objects. Avoid areas where water may

damage a scale not meant for a washdown environment.
The interface cable between the scale and the indicator must be protected against crushing, cutting, or moisture

damage. If the chosen site has such potential dangers, some method of protection, such as running the cable in

conduit, is necessary.
In operation, the scale must be level within 1/4". Either choose a site where the floor is close to this standard to

avoid excessive shimming, or modify the floor at the chosen site to meet this standard.

3.3

Unpacking

Remove all packing material and visually inspect the scale and pit frame for visible damage caused during

shipment. The shipping container should contain the scale, pit frame, scale feet, this manual, the indicator, and a

10-ft length of load cell cable.
The Summit SD-1150-WP Dialysis Scale has one threaded eyebolt hole located in the center of the deck to allow

installation of an eyebolt hook for use when lifting the scale with chains. It’s recommended to use a 1/2 in-20NF

eyebolt to lift the scale.

Figure 3-1. Proper Lifting Technique