6 pit installation – Rice Lake Dialysis Scale - SD-1150-WP User Manual
Page 9
SD-1150-WP Installation & Operation Manual - Scale Installation
5
servicing or cleaning.
Figure 3-3. Load Cell Protection
8. When the interface cable is protected and in its final position, complete connections to the indicator. See
the indicator installation manual for wiring information.
9. If necessary, trim corners as described in Section 4.2 on page 7.
10. Check all strain relief fittings for tightness.
11. Put the cover back onto the junction box assembly and slide the junction box back into the floor scale
cutout.
12. Secure the Summit SD-1150-WP side plate.
3.6
Pit Installation
The Summit SD-1150-WP Dialysis Scale can be installed in a shallow pit using the optional Summit
SD-1150-WP pit frame. Optional height-adjustment holes are available. The following site considerations and pit
frame drawings are meant only as a brief overview of the principles involved with mounting the scale in a
floor-level pit. The pit must be installed in a suitable poured-concrete foundation according to standard
construction practices.
Figure 3-4. Pit Frame Diagram
Site Considerations
Debris, floor sweepings, or material spills may accumulate in the pit and interfere with scale operation. You
should periodically clean the pit. The Summit SD-1150-WP has a threaded hole centrally located for eyebolts so
the scale can be easily lifted from the pit.
SCALE FLOOR
LOAD CELL CABLE