0 installation instructions, 1 pillar and beam installation – Rice Lake Mechanical Chair Scale (RL-MCS) User Manual

Page 6

Advertising
background image

2

Mechanical Chair Scale Installation and Operation Instructions

2.0

Installation Instructions

You will receive your Mechanical Chair Scale partially assembled. Those items that need additional assembly
are:

Pillar and beam assembly to scale base

Steelyard rod connection

Transport handle onto scale base

Seat and footrest installation

Arm rest installation

Remove all components from the shipping crate and lay out in a convenient place.

2.1

Pillar and Beam Installation

The pillar and beam comes separate from the scale base and must be attached prior to use.

Figure 2-1. Pillar and Beam Components

Use the following steps to attach the pillar and beam to the scale base.

1. Have the scale sitting on the floor in an area that allows you to work freely.

2. Lock casters on the frame to eliminate the unit from rolling while assembling the scale.

Figure 2-2. Lock Casters to Keep From Rolling

Beam

Pillar

Push down on latching
a s s e m b l y t o l o c k
whe els and prevent
scale from rolling.

Advertising