The following points are to help ensure proper installation of the load bars. If any further assistance is required,

please contact your nearest factory or dealer.

Important

When planning an outdoor location for the load bars, choose a site which will allow for adequate
drainage away from the scale. Immersing the load cells in water can damage the load cells and void the
warranty.

Try to install the load bars on a firm, level surface. The load bars do not have to be installed perfectly

level, but a substantial slope will decrease accuracy. All weight transfer must take place through the

pads at the end of each load bar. Make sure there is no contact between the ground and the center of the

load bar.

Install the load bars in the upright position. This will allow for accurate weighing and will help keep

any foreign material out of the load bar.

Do not drill into or weld onto the load bars as this may cause internal structural or electrical damage.

Secure the load bars to the weighing platform using the mounting lugs supplied.

Install the cable so that it is not stepped on or run over. Cable failure due to physical damage is not

covered under warranty.

When constructing the weighing platform, ensure excessive sagging does not occur. This may cause

inaccuracies in weighing and could damage the cable.